John Paul Construction

panthera-beaufort pk2Project:  Beaufort Park, London. NW9
Client:    John Paul Construction
Developer:  St George Plc

The Brief:   We were awarded this substantial contract to provide an extensive hoarding package to John Paul Construction as they undertook massive redevelopment works in North West London.

Using a Hiab lorry we began by dismantling the existing concrete block supported hoarding on site, making good and then decorating the panels to the high standard required. Again using the Hiab lorry we installed the newly decorated hoarding panels to create a site perimeter to contain the building works. Included in the brief were scaffold tower hoardings, vehicle and pedestrian access gates, crane hoarding, and decoration of all hoardings to maintain the professional appearance of the site.