Author Archives: shannon

Contract Award- Stonewest Ltd

We have recently been awarded a variety of high profile contracts, none more so than the prestigious site of the Austin Reed flagship store in Regent Street. We provided a designed and calculated hoarding package which was decorated to retain the professional appearance of the store during renovations. We also provided an NCP115 compliant scaffold alarm system to ensure all vulnerable access points were covered.

Testimonial – John Sisk & Son

I would like to congratulate Gary Herbert from Panthera on winning the 55 Victoria Street May Health & Safety award.
Keep up the good work.

Regards

Chris Jaques
Project Manager at 55 Victoria Street

Testimonial – Mercer Scaffolding

Just thought l would mail you to thank both you and your team for the works carried out to the above.
I understand from site that everything when well, l have just been sent a picture of the hoarding and it looks really good. (Shame it has to be covered up)
I have spoken to Paul on the phone this morning to thank him for all his help in achieving its completion on time.
Hope that this is the 1st on many more that we can work on in the near future.

Many thanks

Malcolm Wright
For and on Behalf of Mercer Scaffolding

Contract Award – McLaren Construction

We have just won another contract from McLaren to provide them with a site specific designed and calculated hoarding package. In addition we will be providing biometric access control and CCTV. This project is for a new arts centre in Southampton.

John Paul Construction

panthera-beaufort pk2Project:  Beaufort Park, London. NW9
Client:    John Paul Construction
Developer:  St George Plc

The Brief:   We were awarded this substantial contract to provide an extensive hoarding package to John Paul Construction as they undertook massive redevelopment works in North West London.

Using a Hiab lorry we began by dismantling the existing concrete block supported hoarding on site, making good and then decorating the panels to the high standard required. Again using the Hiab lorry we installed the newly decorated hoarding panels to create a site perimeter to contain the building works. Included in the brief were scaffold tower hoardings, vehicle and pedestrian access gates, crane hoarding, and decoration of all hoardings to maintain the professional appearance of the site.

Testimonial -T&B (Contractors) Ltd

Just a quick line to say thanks for the service provided by Panthera.
The hoarding and the paint finish are a credit to us both and all of the team including the electricians were more than helpful.

Thank you all

Liam Dixon ICIOB
Site Manager for St. Bernard’s Hospital Project

 

Skanska Construction UK Ltd

panthera-bermondsey diveProject:  Bermondsey Dive-Under
Client:    Skanska Construction UK Ltd

The Brief:   Skanska were awarded the contract with Network Rail Infrastructure for the construction of the Bermondsey Dive-Under and associated structure strengthening works, which form part of a £60 million Thameslink Development Programme.  The Bermondsey Dive-Under will be formed of 11 new interconnected structures and is hoped to be completed by 2017.

Panthera Security have provided our full Analytical CCTV Package for the duration of the works, which includes over 20 fully monitored cameras, a multi speaker PA system, and manned response units.

Vinci Construction UK

panthera-abbey gardens-readingProject:  Abbey Gardens. Reading
Client:    Vinci Construction UK

The Brief:   Vinci Construction UK won the contract for the redevelopment of this 8 storey office building which was to be carried out to a very high specification. This was a huge project and we at Panthera were thrilled to be awarded a multi-service contract for the enabling works.

Our M & E division were tasked with providing a comprehensive temporary electrics package, providing power to the entire site. They also undertook the servicing of all fire extinguishers and installed a full fire evacuation system which included heat detectors and hard-wired break glass units.
Our Hoarding division used a HIAB lorry to install our concrete filled barrel hoarding system to create a site perimeter. A scaffold tube is concreted into each barrel to form a framework to fix and support the plywood hoarding. We also provided vehicle access gates and a single access personnel door with a digital lock.
Finally our Security division installed a Radio Alarm System to the scaffold to prevent unauthorised access.